PROJECT

Southern Cross Care

Installation of Sewer Pit

CLIENT
Southern Cross Care
SERVICE

Installation of 2000L
Sewer Pit

LOCATION

Sutherland RAC

TIMELINE
2023

PROJECT INFORMATION

Southern Cross Care engaged our team with a critical project at their Sutherland Residential Aged Care (RAC) facility. The objective was to install a 2000L sewer pit to enhance the efficiency and functionality of their wastewater management system. 

cdv_photo_008 (12)

OBJECTIVES & PRIORITIES

objectives_fit for purpose
Fit for Purpose
(compliant)
objectives_cost savings
Cost
Savings
objectives_quality workmanship
Quality
Workmanship
objectives_fast response
Tight
Deadlines

SCOPE OF WORKS

  • We excavated and removed the existing grease trap, measuring 2.25m x 750mm x 2.6m, and responsibly disposed of it off-site.
  • The groundwork involved preparing the base and achieving the appropriate ground level with precise base materials and compaction, setting the foundation for the sewer pit.
  • We supplied and expertly installed a Halgan 2000L inground grease trap, a crucial component of the enhanced wastewater management system.
  • The sewer pit's inlet and outlet were seamlessly connected into the existing pipework, ensuring a streamlined and efficient flow of wastewater.
  • We supplied and installed two 100mm inspection points at the inlet and outlet of the sewer pit, facilitating maintenance and monitoring.
  • The sewer pit was backfilled using approved materials, and the area was meticulously compacted to ensure structural integrity.
  • Two grease trap risers, each at 900mm, were supplied and installed, allowing for easy access and maintenance.
  • We supplied and installed two Class D access lids, providing secure and convenient entry points for inspections and service.
  • A concrete pad was formed up and poured around the access lids and inspection points, enhancing durability and accessibility.
  • After concrete curing, the formwork was stripped, and the project area was thoroughly cleaned, leaving no debris or safety hazards behind.
  • To ensure responsible waste disposal, we supplied a 3m skip bin for the removal of project-related rubbish.
  • A 1.8T Excavator was supplied for the project's duration, aiding in excavation and construction tasks.

KEY ACHIEVEMENTS

  • Safety Priority: The project began with a comprehensive risk assessment, and safety measures were meticulously adhered to throughout, ensuring the well-being of personnel and residents.
  • Quality Workmanship: Each task, from excavation to concrete pad formation, was executed with precision and adherence to industry standards, guaranteeing the sewer pit's functionality and longevity.
  • Convenient Inspection and Maintenance: The inclusion of inspection points, risers, and Class D access lids streamlined future maintenance and monitoring processes.
  • Responsible Waste Management: The project's commitment to responsible waste disposal, including the provision of a skip bin, demonstrated our dedication to environmentally conscious practices.
  • Efficient Equipment Provision: The supply of a 1.8T Excavator facilitated smooth project operations and timely completion.