PROJECT

Schools Infrastructure NSW

Replacement of Defective Sewer Pipework

CLIENT
Schools Infrastructure NSW
SERVICE

Sewer Pipework Replacement

LOCATION

Windsor Public School

TIMELINE
2023

PROJECT INFORMATION

Schools Infrastructure NSW enlisted our services to address a critical issue at Windsor Public School, involving the replacement of faulty sewer pipework. The project, carried out in 2023, aimed to resolve the sewer system's problems efficiently and ensure the safety and functionality of the school's facilities.

cdv_photo_318

OBJECTIVES & PRIORITIES

objectives_fit for purpose
Fit for Purpose
(compliant)
objectives_cost savings
Cost
Savings
objectives_quality workmanship
Quality
Workmanship
objectives_fast response
Tight
Deadlines

SCOPE OF WORKS

  • Conducted a comprehensive on-site risk assessment.
  • Established an exclusion zone using temporary fencing for safety.
  • Performed service locating to identify potential services within the excavation area.
  • Removed and disposed of the bitumen surface from the site.
  • Manually excavated the sewer pipework by hand.
  • Provided and installed 6 meters of 100mm PVC pipework, connecting it to the existing system.
  • Backfilled the pipework using approved materials to ensure structural integrity.
  • Compacted the work area for stability and safety.
  • Restored the bitumen surface to its original condition.

KEY ACHIEVEMENTS

  • Our team carried out meticulous service locating to identify potential underground services within the excavation area, minimizing the risk of accidental damage to existing infrastructure.
  • Bitumen surface was removed and manually excavated by hand to access the defective sewer pipework, demonstrating our commitment to precision and minimizing disruption to the school environment.
  • The pipework was backfilled using approved materials, guaranteeing the structural integrity of the sewer system while adhering to quality standards.
  • To maintain the school's infrastructure, we reinstated the bitumen surface, ensuring that the property was returned to its original condition.

The project at Windsor Public School for Schools Infrastructure NSW achieved the successful replacement of defective sewer pipework in 2023. The scope of work encompassed safety measures, precise excavation, quality pipework installation, and meticulous restoration, all contributing to the enhanced functionality and safety of the school's sewer system and infrastructure.