PROJECT INFORMATION

Anglicare's Minto Gardens facility required a comprehensive upgrade to their sewer pump system to ensure efficient waste management and comply with modern standards. The project involved the replacement of the existing sewer pump system, including the installation of trench drains and a GRC pit, with all works meticulously planned and executed to minimize disruption to the facility's operations. This case study outlines the scope of works carried out to achieve a reliable and effective sewer pump replacement.

anglicare-stormwater-main2

OBJECTIVES & PRIORITIES

objectives_quality workmanship
Quality
Workmanship
objectives_compliance
Compliance
objectives_safety
Safety
Management
objectives_minimal disruption
Minimal
Disruption

SCOPE OF WORKS

On-Site Risk Assessment

  • Conducted a thorough risk assessment to ensure safety and compliance with all relevant regulations before commencing work.

Service Locating and Preparation

  • Carried out service locating prior to concrete cutting to identify and mark any underground utilities, ensuring no disruption to existing services.

Trench Drain and Pit Installation

  • Supplied and installed 4 units of 300mm Aco K300 trench drains with stainless steel heel-proof grates, totaling 8 meters.
  • Supplied and installed a 600mm GRC pit with a light-duty grate.

Mechanical Excavation

  • Conducted mechanical excavation by hand to install new outlets for each trench drain, ensuring precision and minimizing damage to the surrounding area.

PVC Drainage Installation

  • Supplied and installed PVC drainage for the new stormwater trench drains and pits, connecting them to the nearby existing stormwater system as per the project plan.

Backfilling and Compaction

  • Backfilled the pipework using approved materials and compacted the soil to ensure stability and longevity of the installation.

Surface Reinstatement

  • Reinstated all concrete and landscape surfaces to their original condition, ensuring minimal visual impact and maintaining the aesthetic of the facility.

Site Clean-Up

  • Removed excess spoil from the site, leaving the area clean and ready for regular use.