PROJECT
Anglicare
Hot Water Replacement Works
Glenhaven, NSW
$250,000
PROJECT INFORMATION
JetBlack Plumbers undertook a significant project at Glenhaven to replace the existing hot water systems with new, efficient solar hot water systems. This stage of the project involved the installation of 40 Rheem Solar LL 325l 3.6kw units, complete with all necessary components and safety measures. Our team provided comprehensive safety management plans and completed the project on time and within budget, ensuring minimal disruption to residents and maintaining a strong focus on safety and customer satisfaction throughout.
OBJECTIVES & PRIORITIES
Workmanship
Management
Disruption
SCOPE OF WORKS
On-Site Risk Assessment
- Conducted a comprehensive risk assessment to identify and mitigate potential hazards before commencing work.
Disconnection and Removal
- Safely disconnected plumbing and electrical connections to the existing hot water systems.
- Removed the old hot water systems and all related rubbish from the site to prepare for new installations.
Installation of New Solar Hot Water Systems
- Supplied and installed 40 units of Rheem Solar LL 325L 3.6kW hot water systems, including tanks, collectors, and pumps.
- Installed 18 Collector Npt200 Laser Welded Collectors across 9 units to enhance solar collection efficiency.
- Equipped each unit with 2 Tomson HPS tempering valves, totaling 98 units, ensuring proper temperature regulation.
- Fitted 49 Tomson non-return isolation valves to prevent backflow and ensure system integrity.
- Installed 49 Logi pressure reduction valves to maintain optimal water pressure throughout the system.
Roof Flashings and Pipework
- Supplied and installed new Dektite roof flashings for all hot water solar pipework, ensuring a weather-tight seal with appropriate fixings and silicone.
Reconnection and Commissioning
- Reconnected plumbing and electrical systems for the newly installed hot water systems.
Test and Commission Works
- Conducted thorough testing and commissioning to ensure each system operated efficiently and safely.
- Verified the performance and reliability of the new installations, ensuring they met all operational standards.
KEY ACHIEVEMENTS
This project highlights the detailed scope of works executed for the solar hot water system replacement project at Anglicare's Glenhaven site. The project included a meticulous risk assessment, safe disconnection and removal of old systems, installation of advanced solar hot water units, and thorough testing and commissioning. Each installation step was performed with precision, ensuring optimal performance and safety, ultimately contributing to Anglicare's sustainable energy goals.