JetBlack Plumbers was engaged to complete a comprehensive hot water upgrade at Bourke House, part of Anglicare’s Goodwin Village Residential Living. The upgrade included the removal of aging components and the installation of a new, high-efficiency hot water system to improve reliability and performance across the site.

OBJECTIVES & PRIORITIES
Workmanship
Disruption
Reduction
SCOPE OF WORKS
On-site risk assessment and safety setup
Disconnection and removal of all critical hot water system components, including:
- Gas continuous flow units
- Circulating pumps
- Storage tanks
Supply and installation of:
- 7 x Rheem 27L Continuous Flow External Star 82°C Natural Gas Units
- 2 x 430L Rheem Storage Tanks
- 1 x Grundfos CM10-1 240V Pump
- 1 x Rheem 430L Storage Cylinder
- 1 x Rheem Rediset Dual UPS20-60N Pump
- 1 x Rheem Rediset Dual UPS32-80N Pump
- 2 x Cover Dual Circulator UPS20-32 Style 1 Units
- 1 x UV Disinfection System & Controller (APT320)
- 1 x Potable Dual Vertical Multistage Booster Pump Set
- 1 x Weatherproof Acoustic Pump Enclosure (1350x1350x1350mm, Colourbond Monument finish)
Replacement of all check valves, isolation valves, and associated fittings
Replacement of insulation/lagging throughout the plantroom








DELIVERY
The JetBlack team attended site and followed all Anglicare access protocols, including sign-in and SWMS acknowledgement via the Anglicare app. After conducting a Job Safety Analysis (JSA), an exclusion zone was established to maintain a safe work environment throughout the project.
Old hot water units and pumps were safely removed from the plant room, and new units were lifted into place. The installation included dual circulator pumps, booster pumps, storage tanks, and protective enclosures. Once installed, the system was powered, tested, and commissioned to ensure full functionality.
A key value delivered on this project was JetBlack Plumbers' ability to complete the works with minimal disruption to residents and staff in a live aged care environment. The team’s extensive experience with essential plumbing services upgrades in operational facilities ensured clear communication with stakeholders, strict compliance with WHS procedures, and a smooth transition to the new system.
The team confirmed the successful restoration of hot water plumbing services and updated the site contact before demobilising. A detailed clean-up followed, including appropriate handling of old materials.